طبقة علوية بيضاء من البولي يوريثين عالية التعتيم ومقاومة ممتازة للاصفرار
اثنين-عنصر، البولي يوريثين طبقة علوية بيضاء يتميز بقدرة إخفاء عالية ومقاومة ممتازة للاصفرار عند التعرض لأشعة الشمس. بفضل تركيبته المصنوعة من البولي يوريثان، يُشكل أغشية صلبة فيزيائيًا ذات مقاومة كيميائية عالية للماء والمنظفات والمواد الكيميائية المنزلية.
رقم الصنف :
Polyurethane White Topcoatطلب :
Used mainly for wooden furniture, also in auto, architecture and more.ميزة خاصة :
Durable, chemical-resistant, adheres well, retains gloss, levels smoothly.
Technical Data
Sheen Variants: Full gloss,50%,30%,20%,10% and Full Matt
Colors: White (opaque)
Practical Covering Capacity: For estimation of practical covering capacity, following factors to be taken into account: surface profile, uneven application, over spray, losses in container and equipment etc.
|
Theoretical covering capacity
|
Recommended Dry Film Thickness per coat |
Theoretical Spread rate ㎡/ltr |
|
|
Minimum |
40 microns |
9.00 ㎡/ltr |
|
|
Maximum |
60 microns |
5.80 ㎡/ltr |
|
|
Typical |
50 microns |
7.00 ㎡/ltr |
|
|
Drying Time
|
Substrate Temperature |
Sandable Dry |
Overcoating Interval |
|
|
Minimum |
Maximum |
|||
|
25℃ |
3H |
8H |
Indefinite |
|
|
35℃ |
2H |
6H |
Indefinite |
|
|
45℃ |
1.5H |
3H |
Indefinite |
|
Application Data
Method of application : Conventional spray application
Thinner : PU Thinner
Thinning ratio (per kilogram): Use 60% to 100% for ease of application depending on the gun type .
Available Pack Size: 4LY、4LF、18LF、20LY、200LY
At a temperature of 23 ℃ and a relative humidity of 50%:
Drying time: Refers to 20-60 minutes of touch drying;
Finger press drying: 2-6 hours (actual drying time may vary depending on temperature, humidity, and wind speed)
Theoretical paint consumption:12 square meters/liter/coat. (Dry film thickness:25-30 microns, actual coating area may vary depending on construction method, surface roughness, and construction environment).
Application Steps
1. Substrate Preparation: For blanks or boards, sand with 320-mesh sandpaper; for topcoats, sand with 400-600-mesh sandpaper.
2. Paint Proportioning: The ratio of base coat:hardener:thinner=1:0.5:1.
3. Primer Process: After spraying the first coat of primer, allow air-drying for 5 hours, then sand and re-spray the second coat of primer. A third re-spray is optional if necessary. (Note: The amount of thinner can be appropriately reduced during re-spraying.)
4. Color Adjustment: After primer spraying is completed, color-adjusting oil can be used for color adjustment or color modification.
5. Glazing: Select the required gloss level and apply the corresponding.
Applocation Details


خريطة الموقع مدونة Xml سياسة الخصوصية
حقوق الطبع والنشر
@ Runshine New Materials(FoShan) Co.,Ltd. جميع الحقوق محفوظة.
الشبكة المدعومة
ترك رسالة
مسح ضوئي إلى WeChat :
مسح ضوئي إلى WhatsApp :